Zimba Capital Research

Infrastructure & Energy

Power systems, compute capacity, logistics, ports and the physical assets everything else depends on. The binding constraint is rarely the idea; it is the grid connection, the fab slot, the lead time.

1 article
  • August 23, 2026

Africa’s AI Compute Gap: Power, Sovereignty, and the Next Great Infrastructure Divide

Only a small number of countries host AI-specialised data centres, and Africa is almost entirely absent from that map.

Emmanuel Birungi